Abbar & Zainy Cold Store-Dammam Execution and installation of new pipeline.  Wastewater line at area 1/210-Dammam - The project includes, installation of deep sewer line of 350mm dia. And 400mm dia. GRP pipe (1100m)
1,100,000.00
09-01-1417
to
29-06-1417
Ministry of Municipal & Rural Affairs - Water & Sewage Directorate-Eastern Province Procurement of material and installation Water distribution and Sewer collection and storm water drainage networks for Al-Jalawiyah Area-Dammam West Area. - The project comprised of 110,160mm of water pipelines (dia. 75 to 600mm) sewer pipelines (dia. 200-900mm) sewer force main lines, 8,700m (dia. 800mm)storm water  line 29, 804mm (dia. 300-2200mm), 2 pump stations, and 1 generator building, 2 residential building, transformer house, 1 communutor building.
450,000,000.00
13-05-1402
to
12-09-1407
Riyadh Region Water & Sewage Authority Procurement of material, execution, operation & maintenance.  Diriyah Water Supply Project - The contract includes the supply of pipelines (dia. 100mm tp 600mm) together w/ 2953 No.s hosue connections. Also include the const. Of pump station, transformer building, guard house, and erection of pump station w/ standby diesel alternator. 
28,588,000.00
18-01-1404 - to 17-01-1406
Ministry of Municipal & Rural Affairs - Water & Sewage Directorate-Eastern Province Procurement of material, installation and operation.  Water & Wastewater projects- Area1 (Northeast Dammam) & Area 3- S-3 (South Dammam) Contract No. 4/47/8/19) - Water main & Branches varying in size from 75mm to  1000mm dia. Including all necessary appurtenances such as valves, hydrants, tees, bends, crosses and thrust blocks and totaling approx. 100,000m in length with house connections. - Gravity sewers & forcemains varying in size from 200mm to 1200mm dia. and total approx. length 47,800m in length complete with sewers, manholes, chambers, drains, vents, etc.. and with house connections. one waste water pump. - Station complete with 3 submersible pumping units.
82,899,777.00
24-02-1405
to
24-02-1408
Ministry of Municipal & Rural Affairs - Water & Sewage Directorate-Eastern Province Procurement of material installation and operation.  Water and sewer projects, area NW-2 and area NW-7 (Northwest Dammam Contract No. 4/47/8/19 - Water main & branches varying in size from 75mm to 400mm dia. Including all necessary appurtenances such as valves, hydrants, tees, bends, crosses and thrust blocks and totaling approx. 57,000m in length with house connections. - Gravity sewers & forcemains varying in size from 200mm to 1200mm dia. and total approx. length 41,200m in length complete with sewers, manholes, chambers, drains, vents, etc.. and with house connections. - One waste water pump. station complete with 3 submersible pumping units.  - One wastewater pump station complete with 4 submersible pumping units and 2 lift stations complete with 4 & 3 submersible pumping units respectively. - Water and sewage Authority -Dammam Branch building construction and furnishing a building of 3 stories complete with elevators, central AC, Alarm system, special cashier room. 
72,779,545.00
22-04-1405
to
05-10-1408
Ministry of Municipal and Rural Affairs / Water & Sewage Directorate-Eastern Province  Execution & installation of new pipe lines & house connections. Wastewater network at area 1/71 & 1-91 at Dammam-Phase II - The Project includes-installation of deep sewer GRP line which varies from 20mm dia. To 1000mm dia. - Installation of GRP forcemain pipe line of 350mm dia. Construction fo pump station and installation fo pumps. - Construction of air valve chambers, washout chambers and discharge chambers. - Installation of vitrified clay pipe (VCP) dia. 150mm for house connections. - Construction of air valve chambers, washout chambers and discharge chambers. 
14,845,186.23
15-10-1412
to
15-01-1414
Ministry of Municipal and Rural Affairs / Water & Sewage Directorate-Eastern Province  Execution, installation of new pipeline Wastewater network at Are 1-71 & 1-91 At Dammam Phase I - The project includes-installation of deep sewer GRP pipe of dia. 1000mm to 1300mm dia. - Installation of GRP forcemain pipe line of 500mm dia. - Construction of pump station and installation fo pumps. - Construction of air valve chambers and washout chambers. 
16,261,341.90
08-11-1412
to
03-11-1413
to
10-07-1413
to
03-11-1414
Ministry fo Municipal & Rural Affairs / Water & Sewage Authority -Eastern Province Execution& installation of new pipelines & UPVC house connections.  Wastewater network at area 1-71 & 1-91 at Dammam-Phase V - The project includes: Installation of deep sewer GRP Lines which varies from 200mm dia. To 150mm dia. (30KM) - Installation of GRP lines of 150mm dia. For house connection (15km) - Connecting of houses by UPVC pipes of 160mm dia. (1200 Nos.) - Construction of three (3) structures warehouses.
26,405,200.00
11-04-1414
to
10-01-1418
Ministry of Municipal & Rural Affairs / Water & Sewage Authority -Eastern Province Execution& installation of new pipelines & UPVC house connections.  Wastewater network at area 1-71 & 1-91 at Dammam-Phase V - The project includes: Installation of deep sewer GRP Lines which varies from 200mm dia. (30KM) - Installation of GRP lines of 150mm dia. For house connection (15km) - Connecting of houses by UPVC pipes of 160mm dia. (1200 Nos.)
19,487,261.82
01-11-1414
to
01-05-1418
Ministry of Municipal & Rural Affairs / Water and Sewage Authority - Eastern Province  Execution & installation of new pipelines. Replacement of 1700mm dia. -Al-Jafr-Hofof Part I&II - The Project includes installation of new parallel sewer line of dia. 1200mm, 1400mm & 1500mm. - Repair of damaged areas fo the dia. 1700mm existing line. 
1,940,000.00
06-03-1416
to
08-08-1417
Ministry of Municipal & Rural Affairs-Dammam Municipality  Replace existing sewer lines and provide new pipeline Wastewater line at 18th Street Dammam dia. 90mm FRP
4,239,000.00
03-03-1418
to
02-03-1419
Al-Hassawi Est.  Execution & installation of new pipelines and house connections  Haii Al-Shatie Project - The project includes-FRP line dia. 200 to 250mm about 10km. - UPVC pipe dia. 90-160mm dia. About 20km
8,946,617.00
18-03-1418
to
17-03-1419
Ministry of Municipality & Rural Affairs, WSA-Eastern Province Execution & installation of FRPP new pipe lines (Gravity and Forcemain) UPVC house connections.  Wastewater network project-Area 1-71 & 1-91 Dammam-Phase 8. - The Project includes installation of deep sewer GRP lines of 200mm dia. (24kms). Installation of GRP lines of 150mm dia. For house connection of houses by UPVC pipes of 160mm dia. (800 Nos.).
15,822,892.20
11-10-1418
to
10-10-1421
Ministry of Water & Electricity / Eastern Province Procurement of material, execute house connections.  Al-Hassa House Connection
11,835,500.00
26/08/1999
to
23 - 07-2002
Ministry of Water & Electricity / Eastern Province   Station, Line 'D'
5,220,980.00
06-04-1421
to
06/04/1423