Sr.# |
CLIENT EMPLOYER |
NATURE OF JOB |
DESCRIPTION |
CONTRACT VALUE (SR) |
PERIOD |
1 |
Ministry of Agriculture & Water |
Operation & Maintenance |
Operation & Maintenance of Wells and Water Networks in the Western Region. |
23,000,000.00 |
01/06/1393 to 01/08/1399 |
The Project comprised of Operation & Maintenance of wells and Water Networks including installation of pumps. |
|
2 |
Ministry of Agriculture & Water |
Operation & Maintenance |
Riyadh Sewage Net work |
95,500,000.00 |
01/12/1394 to 30/11/1397 |
Operation & Maintenance of Riyadh Sewage Networks. It includes Operation & maintenance of the sewage network in Riyadh City and the Sewage Treatment Plant. |
|
3 |
Ministry of Agriculture & Water |
Operation & Maintenance |
Operation and Maintenance of Khasim El-Ann Water treatment of Plant of National Guard. |
15,412,000.00 |
28/01/1395 to 28/08/1397 |
|
4 |
Ministry of Agriculture & Water |
Construction |
Salboukh Well Field Project |
37,000,000.00 |
24/01/1396 to 24/11/1399 |
Supply, erection & installation of submersible pumps including concrete foundation, thrust blocks and chambers, concrete platforms, asbestos pipe laying and Elect. Controls. |
|
5 |
Ministry of Agriculture & Water |
Construction |
Chlorination Project |
37,540,000.00 |
28/01/1396 to 28/08/1399 |
Supply, erection and installation of chlorination equipment on 118 sites throughout the Kingdom. It includes installation of all equipment with necessary piping work |
|
6 |
Ministry of Agriculture & Water |
Construction |
Al-Washim Al Kabeer Water Project |
240,390,000.00 |
20/04/1399 to 20/10/1401 |
Supply, erection and installation of water net work and related works in Shaqra and adjoining villages. It includes installation of deep well pump, electrical works, buildings, water reservoir, elevated R. C. water tank, Al Washim transmission line, and distribution network and house connections. |
|
7 |
Civil Works Company |
Construction |
Dammam Hotel |
40,000,000.00 |
1396
to
1398 |
Complete construction of Hotel building and providing all required furniture's for the hotel.(trunkey project) |
|
8 |
Civil Works Company |
Construction |
Dammam Oberoi Hotel |
160,000,000.00 |
1397
to
1400 |
Complete construction of Hotel building and providing all required furniture's for the hotel.(trunkey project) |
|
9 |
Ministry of Municipal & Rural Affairs |
Construction |
Water distribution and Sewer collection and storm water drainage networks for Al-Jalawiyah Area-Dammam West. |
450,000,000.00 |
13/05/1402 to 12/09/1407 |
Water & Sewage Directorate-Eastern Province |
The project comprised 110,160 Lm of water pipelines of dia. 75 mm to 600 mm, 212,000 Lm of sewer pipe lines (dia. 200 to 900mm), 800 mm dia sewer force main lines, 8,700 Lm, 29,804 lm of storm water line (dia. 300 mm to 2200 mm), 2 pump stations, and 1 Generator building, 2 Residential building, Transformer house, 1 Communutor building etc.. |
|
10 |
Ministry of Agriculture & Water |
Construction |
Riyadh Water Treatment and Distribution system, for New Areas, Part 7. |
54,279,980.00 |
08/06/1402 to 07/06/1404 |
The project comprised laying of pipelines approx. 505,000 LM (of dia. 63 mm to 600mm) and providing 3,835 No. of house connections. |
|
11 |
Ministry of Agriculture & Water |
Operation & Maintenance |
Kingdom of Saudi Arabia - Wells Project |
65,422,000.00 |
22/01/1403 to 22/10/1404 |
Operation & Maintenance of potable water wells and related works throughout the Kingdom |
|
12 |
Riyadh Region Water & Sewage Authority |
Construction |
Diriyah Water Supply Project |
28,588,000.00 |
18/01/1404 to 17/01/1406 |
The contract included supply and installation of pipelines of 100mm dia to 600mm together with 2953 No. water house connections. Also include the const. of pump station, transformer building, guard house, and erection of pumps and standby diesel Generator. |
|
13 |
Ministry of Agriculture & Water |
Construction |
Extension of Riyadh Distribution System, Stage 2 |
28,483,000.00 |
06/08/1404 to 06/11/1405 |
The contract consist of installation of pipeline of 100mm dia to 600mm, including all necessary fittings. Total approximate length 210,000 Lm with 1390 Nos. house connections. |
|
14 |
Ministry of Agriculture & Water |
Operation & Maintenance |
Administration, operation and maintenance of potable water projects in the southern Part of Central Region. |
14,739,000.00 |
22/10/1404 to 22/10/1405 |
The project composed of pumping units of potable water wells. |
|
15 |
Ministry of Agriculture & Water |
Operation & Maintenance |
Administration, operation and maintenance of potable water projects in the northern Part of Central Region. |
15,198,000.00 |
22/10/1404 to 22/10/1405 |
The project composed of pumping units with 123 No .distribution networks. |
|
16 |
Ministry of Municipal & Rural Affairs |
Construction |
Water & Wastewater projects- Area1 (Northeast Dammam) & Area 3- S-3 (South Dammam) Contract No. 4/47/8/19), Comprising |
82,899,777.00 |
24/02/1405 to 24/02/1408 |
Water & Sewage Directorate-Eastern Province |
Water main & Branches of size varying from 75mm to 1000mm dia. Including all necessary appurtenances such as valves, hydrants, tees, bends, crosses and thrust blocks and totaling approx. length of 100,000 Lm with house connections. |
Gravity sewers & force mains varying in size from 200mm to 1200mm dia. and total approx. length 47,800m in length complete with sewers, manholes, chambers, drains, vents, etc.. and with house connections. one waste water pump Stations with 3 submersible pumps. |
|
17 |
Ministry of Municipal & Rural Affairs |
Construction |
Water and sewer projects, area NW-2 and area NW-7 (Northwest Dammam Contract No. 4/47/8/19, Comprising |
72,779,545.00 |
22/04/1405 to 22/04/1407 to 05/01/1408 |
Water & Sewage Directorate-Eastern Province |
Water main & branches varying in size from 75mm to 400mm dia. Including all necessary appurtenances such as valves, hydrants, tees, bends, crosses and thrust blocks and totaling approx. 57,000 Lm in length with house connections. |
Gravity sewers & force mains varying in size from 200mm to 1200mm dia. and total approx. length 41,200m in length complete with sewers, manholes, chambers, drains, vents, etc.. and with house connections. |
One waste water pump. station complete with 3 submersible pumps. |
One wastewater pump station complete with 4 submersible pumps and 2 lift stations complete with 4 & 3 submersible pumps respectively. |
Water and sewage Authority -Dammam Branch building construction and furnishing a building of 3 stories complete with elevators, central AC, Alarm system, special cashier room. |
|
18 |
Ministry of Municipal & Rural Affairs |
Construction |
Dammam Effluent Outfall Project Contract No.:33/8/19 |
26,802,000.00 |
21/05/1405 to 20/01/1406 |
Water & Sewage Directorate-Eastern Province |
The project comprised of laying of concrete pipe dia. 2000mm from Dammam treatment plant to the sea. including construction of manholes and safety chambers. |
|
19 |
Ministry of Agriculture and Water |
Construction |
Contract No. 7-2B, Extension of Jeddah Water Distribution System. |
55,545,062.00 |
28/05/1405 to 28/05/1407 |
The Project comprises, installation of water pipe line of 110mm to 1000 mm dia including all fittings and making about 6, 600 house connections. |
|
20 |
Ministry of Agriculture and Water |
Operation & Maintenance |
Administration, Operation and Maintenance of potable water projects in North Eastern part of the Kingdom of Saudi Arabia. |
72,394,000.00 |
22/10/1405 to 28/05/1407 |
The Project comprises of 101 No. Well Units with pumping stations, water towers, distribution system and chlorination facilities. |
|
21 |
Ministry of Defense and Aviation. |
Operation & Maintenance |
Operation & Maintenance of the Group IV, at Qassim, Hail, and Al-Hassa Airport. |
79,068,000.00 |
01/01/1406 to 30/01/1409 |
The project comprises of operation, maintenance, cleaning, disinfect the agricultural plants and to supply fuel and water |
|
22 |
Ministry of Agriculture & Water |
Operation & Maintenance |
Administration, Operation & maintenance of potable water projects in Asir and Baha Regions. |
62,354,000.00 |
28/02/1406 to 27/02/1409 |
The project comprises of 140 No. Well Units with pumping stations, water towers, distribution systems and chlorination facilities. |
|
23 |
Ministry of Agriculture & Water |
Operation & Maintenance |
Administration, Operation & maintenance of potable water projects in North Eastern Part of the Kingdom of Saudi Arabia |
61,419,780.00 |
22/10/1408 to 21/10/1411 |
The project comprises of 105 No Well Units with pumping stations, water towers, distribution systems and chlorination facilities. |
|
24 |
Ministry of Agriculture & Water |
Operation & Maintenance |
Administration, Operation & Maintenance of potable water projects in the Central Area , K.S.A |
56,899,400.00 |
22/10/1408 to 21/10/1411 |
|
25 |
Ministry of Agriculture & Water |
Operation & Maintenance |
Administration, Operation & maintenance of potable water projects in Asir and Baha Regions. |
56,796,200.00 |
22/10/1408 to 21/10/1411 |
The project comprises of 171 Nos. Units with pumping stations, water towers, distribution systems and chlorination facilities. |
|
26 |
Ministry of Agriculture & Water |
Construction |
Administration, Operation and Maintenance of potable water projects in North Central Area. |
102,960,400.00 |
07/03/1412 to 06/03/1415 |
The Project comprises of 171 Nos. Well units with pumping stations, water towers, distribution systems and chlorination facilities. |
|
27 |
Ministry of Municipal and Rural Affairs |
Construction |
Operation & Maintenance of sewer and water networks for the city of al-khobar |
55,444,999.00 |
07/03/1412 to 06/03/1415 |
Water & Sewage Directorate-Eastern Province |
The project includes the Operation and Maintenance of all water and sewer networks of different Dia. And kinds, pumping, and lifting stations, sewage treatment plant and water wells. |
|
28 |
Ministry of Agriculture and Water |
Operation & Maintenance |
Administration, Operation and Maintenance of potable water projects in Baha and Bisah area of K.S.A |
39,329,220.00 |
09/04/1412 to 08/04/1415 |
The project comprises of 191 Nos. Well units with pumping stations, water towers, distribution systems and chlorination facilities. |
|
29 |
Ministry of Municipal and Rural Affairs |
Construction |
Wastewater network at area 1/71 and 1/91 at Dammam-Phase II |
14,845,186.23 |
15/10/1412 to 15/08/1414 |
Water & Sewage Directorate-Eastern Province |
The Project includes-installation of deep GRP Sewer line which varies from 200mm dia. To 1000mm dia &. Installation of GRP force main pipe line of 350 mm dia. And Construction of pump station and installation of pumps. & Construction of air valve chambers, washout chambers and discharge chambers. & Installation of vitrified clay pipe (VCP) dia. 150mm for house connections &.Construction of air valve chambers, washout chambers and discharge chambers. |
|
30 |
Ministry of Municipal and Rural Affairs |
Construction |
Wastewater network at area 1/71 and 1/91 at Dammam-Phase I |
16,261,341.90 |
08/11/1412 to 03/11/1413 |
Water & Sewage Directorate-Eastern Province |
The project includes-installation of deep GRP Sewer pipe of dia. 1000mm to 1300mm dia. & Installation of GRP force main pipe line of 500 mm dia. & Construction of pump station and installation of pumps.& Construction of air valve chambers and washout chambers. |
|
31 |
Ministry of Municipal & Rural Affairs |
Construction |
Wastewater network at area 1/71 and 1/91 at Dammam-Phase V |
26,405,200.00 |
11/04/1414 to 10/01/1418 |
Water & Sewage Authority -Eastern Province |
The project includes: Installation of deep GRP Sewer Lines which varies from 200mm dia. To 1500mm dia. (30KM) & |
Installation of 150mm dia.GRP lines for house connection (15km) & |
Connection to houses by UPVC pipes of 160mm dia. (1200 Nos.)& |
Construction of three (3) warehouses. |
|
32 |
Ministry of Municipal & Rural Affairs |
Construction |
Wastewater network at area 1-71 & 1-91 at Dammam-Phase V |
19,487,261.82 |
01/11/1414 to 01/05/1418 |
Water & Sewage Authority -Eastern Province |
The project includes: Installation of deep GRP Sewer Lines which varies from 200mm dia.and above (30KM) |
Installation of GRP lines of 150mm dia. For house connection (15km) |
Connecting of houses by UPVC pipes of 160mm dia. (1200 Nos.) |
|
33 |
Ministry of Municipal & Rural Affairs |
Construction |
Water main network for Dammam Metropolitan City extension of contract M1) |
20,062,186.37 |
03/01/1414 to 23/07/1418 |
Water & Sewage Authority -Eastern Province |
Installation of 1000m dia. CCP Water main line of about 10km |
|
34 |
Ministry of Municipal & Rural Affairs |
Operation & Maintenance |
Operation and Maintenance of sewer and water networks for the city of Al-Khobar. |
60,287,407.73 |
15/05/1415 to 02/11/1418 |
Water & Sewage Authority -Eastern Province |
The project includes the operation and maintenance of all water and sewer networks of different diameter, pumping and lifting stations, sewage treatment plant and water wells. |
|
35 |
Ministry of Municipal & Rural Affairs |
Operation & Maintenance |
Operation & Maintenance (water net work) Hassa |
36,000,000.00 |
15/05/1417 to 14/05/1420 |
Water and Sewage Authority - Eastern Province |
The project includes the Operation and Maintenance of water networks of different dia.and kind, pumping stations and wells, water tanks and O&M of the generators at Weisa field which supply power for 14 wells. |
|
36 |
Ministry of Agriculture & Water |
Operation & Maintenance |
North East Riyadh – Administration, Operation & Maintenance of potable water projects. |
54,257,346.00 |
21/10/1417 to 21/10/1420 |
The projects comprises, O & M of pumping stations, water towers, distribution systems and chlorination system. |
|
37 |
Ministry of Agriculture & Water |
Operation & Maintenance |
Central South Riyadh – Administration, Operation & Maintenance of potable water projects. |
25,887,000.00 |
21/10/1417 to 21/10/1420 |
The projects comprises, O & M of pumping stations, water towers, distribution systems and chlorination system. |
|
38 |
Ministry of Agriculture and Water |
Operation & Maintenance |
East South Riyadh - Administration, Operation and Maintenance of potable water projects. The project comprises O&M of pumping stations, water towers, distribution systems and chlorination system. |
55,287,000.00 |
21/10/1417 to 21/10/1420 |
|
39 |
Ministry of Municipality & Rural Affairs, WSA-Eastern Province |
Construction |
Wastewater network project-Area 1-71 & 1-91 Dammam-Phase 8. |
15,822,892.20 |
11/10/1418 to 10/10/1421 |
The Project includes installation of deep GRP sewer lines of 200mm dia. (24kms). Installation of 150 mm dia.GRP branch lines and connection of houses by UPVC pipes of 160mm dia. (800 Nos.). |
|
40 |
Ministry of Municipal & Rural Affairs |
Construction |
Sewage treatment plant-Al-Hassa, Phase -1 |
37,000,000.00 |
06/02/1998 to 04/01/2002 |
WSA-Eastern Province |
Project comprise Construction of STP including installation and commissioning of screw pumps, sand filters, wash water P.station, Air compressor building, contract tanks & distribution chambers, chlorination building and SCECO building etc |
|
41 |
Ministry of Municipal & Rural Affairs |
Construction |
Sewage networks of Al-Nabiah - Sihat |
13,572,970.00 |
11/10/1418 to 09/04/1421 |
WSA-Eastern Province |
Install gravity line of dia. 200mm, 300mm, 400mm, 500mm, 600mm, 800mm including dual force main line, construct pumping station, generator & transformers room etc. |
|
42 |
Ministry of Water & Electricity |
Construction |
AL-Islahiyah Project - Construction of sewage net work including deep mainlines. |
14,384,443.00 |
31/08/1998 to 27/07/2003 |
Eastern Province |
|
43 |
Ministry of Water & Electricity |
Construction |
Al-Hassa House Connection- Construction of Water and Sewer House connections |
11,835,500.00 |
26/08/1999 to 23/07/2002 |
Eastern Province |
|
|
44 |
Ministry of Water & Electricity |
Operation & Maintenance |
Hassa Maintenance - II. Maintenance of Water lines and Pumping stations. |
38,499,997.00 |
26/08/1999 to 23/07/2002 |
Eastern Province |
|
45 |
Ministry of Municipal & Rural Affairs-Dammam Municipality |
Construction |
Construction of storm water net work for lowering of ground water table at 71/91 phase -1 |
31,290,979.00 |
15/10/1420 to 14/10/1423 |
|
46 |
Ministry of Water & Electricity |
Construction |
Expansion of Secondary treatment plant, south Riyadh comprising aeration tank, clarifiers, screw pumping station etc. |
109,657,421.00 |
25/04/2001 to 13/03/2005 |
Central Province |
|
47 |
Ministry of Water & Electricity |
Construction |
Replacement of Water lines, Riyadh |
19,998,605.00 |
06/07/2001 to 03/06/2004 |
Central Province |
|
48 |
Ministry of Water & Electricity |
Construction |
Construction of Rawdah Storm Water Network, Riyadh |
20,232,530.00 |
24/08/2001 to 15/04/2005 |
Central Province |
|
49 |
Ministry of Water & Electricity |
Construction |
Expansion of Secondary treatment plant, Dammam, Comprising inlet structure, Aeration tank, Clarifier, Screw P.S, Sludge P.S, Sludge belt press etc. |
59,717,334.00 |
02/01/1423 to 01/01/1426 |
Eastern Province |
|
50 |
Ministry of Water & Electricity |
Construction |
Providing water house connection - Riyadh. |
36,760,550.00 |
01/02/2002 to 08/12/2006 |
Central Province |
|
51 |
Ministry of Water & Electricity |
Construction |
Hai Al Shatie III, Dammam - Construction of Pump Station and Sewer network. |
31,181,843.00 |
07/02/2002 to 03/02/2006 |
Eastern Province |
|
52 |
Ministry of Water & Electricity |
Construction |
Area 26/2, Alkhobar, Construction of Pump Station and sewer Network. |
34,362,484.00 |
14/03/2002 to 11/02/2006 |
Eastern Province |
|
53 |
Ministry of Water & Electricity |
Construction |
Construction of Tertiary Treatment plant, Al - Khobar, comprising screw P.S, Sand filter, chlorine contact tank, generator building, Transformer building, chlorination building etc. |
57,572,027.00 |
14/04/1423 to 13/04/1426 |
Eastern Province |
|
54 |
Ministry of Water & Electricity |
Construction |
Construction of Reverse Osmosis Plant at Manfouha and Malaz |
27,319,335.00 |
12/05/1423 to 11/05/1425 |
Central Province |
|
55 |
Ministry of Water & Electricity |
Construction |
Construction of Tertiary Treatment plant, Dammam comprising screw P.S, Waste Water P.S, Sand filter, chlorine contact tank, Admin Building, Mosque, Generator building, Transformer building, chlorination building etc. |
62,000,000.00 |
22/06/1423 to 21/06/1426 |
Eastern Province |
|
56 |
Ministry of Water & Electricity |
Operation & Maintenance |
Hassa Maintenance - III, Operation and Maintenance of Water net work, wells and Pumping station. |
37,305,997.00 |
24/07/2002 to 22/06/2005 |
Eastern Province |
|
57 |
Ministry of Water & Electricity |
Construction |
Sewer Main line replacement, at Al khobar |
10,337,725.00 |
25/07/2002 to 04/07/2004 |
Eastern Province |
|
58 |
Ministry of Water & Electricity |
Construction |
Hassa Sewage Treatment Plant Phase II Project comprise installation of Screw P.S sand filters, chlorine contact tank, distribution chambers etc. |
14,054,474.00 |
29/09/2002 to 29/08/2005 |
Eastern Province |
|
59 |
Ministry of Water & Electricity |
Operation & Maintenance |
Al Khobar Operation & Maintenance -IV. |
60,463,575.00 |
25/12/2003 to 27/01/2004 |
Eastern Province |
The project includes the operation and maintenance of all water and sewer networks of different diameter, pumping and lifting stations, sewage treatment plant and water wells. |
|
60 |
Ministry of Water & Electricity |
Construction |
Hassa Sewage Treatment Plant Phase III Project comprise installation of Screw P.S sand filters, chlorine contact tank, distribution chambers etc. |
10,709,925.00 |
28/08/2003 to 25/07/2006 |
Eastern Province |
|
61 |
Ministry of Water & Electricity |
Construction |
Hai Al Shatie IV, Dammam -Construction of Pump Station and Sewer network |
15,885,016.00 |
01/07/2004 to 18/02/2006 |
Eastern Province |