The natural geographic structure of Saudi Arabia, especially the areas in its sea-side cities and suburbs, often leaves high level water presence in the excavated areas of construction sites, which is problem which is to be solved most efficiently in minimum time possible.
CWC is capable to that, as and when the necessity arises for dewatering at such areas. Our specialized personnel and latest equipments are viable to the demand of situation to execute efficiently the works of excavation, different side support systems, piling and dewatering systems with single and multistage pumping ground water even from a depth of 10m. Some sites were about 90m x 70m with 8m deep. Midst of a populous city or a sea-side with chemically aggressive ground water, our dewatering and shoring divisions are willing to take up the challenge and do it our customer satisfaction.
With over:-
- 200 pumps, well supported with adequate quantity of Well Point Systems,
- 200 + Trench Boxes
- Emons Shoring systems for over 60 Meters
CWC is capable of handing any such requirements for its clients.
Major Activities / projects